Horizon Minerals Talks Results Of A Prefeasibility Study On Its Pennys Find Gold Project In WA
Summary of Interview Underground mine design and schedule producing 329.9kt at a fully diluted grade of 3.2g/t Au for 33.5koz over an approximate 23 month mine life Metallurgical recovery of 88.9% produces 29.8koz recovered under an assumed third party toll milling arrangement in the region Project generates $24.0 million in free cash flow (after capital) […]